Epson 1EMP-S1 Manual de Instalação

Consulte online ou descarregue Manual de Instalação para Projetores Epson 1EMP-S1. Epson 1EMP-S1 Installation manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Installation Manual

F-RAMS®Installation ManualRev 2.0

Página 2

Mounting Bracket

Página 3 - Major Components

• Wiring Cables– To make the installation easier, each F-RAMS®is shipped with 3 quick connectwiring cables. This kit is made up of several cables.– (1

Página 4 - Equipment Needed

GNDACCTerminal Block on the 1 piece BracketPowerMCUValve

Página 5 - General Instructions

• Routing the cable– Make sure that the fiber optic cables that exit the cab have protection over theirconnectors to keep them clean.– Punch a 1/2” ho

Página 6 - – Operating Specifications:

• Flow Meter Connection– Route the fiber optic cable from the back of the MCU unit to the RDU unit which islocated on top of the flow meter.– Avoid su

Página 7 - Pre-Installation Checklist

• RDU Rear Connection– Remove (6) Seal screws holding the backpanel of the RDU. This will expose theinside of the RDU with the followingconnectors:• M

Página 8 - VOLTAGE CHECKS

RDU Rear ConnectionPowerMCUfiberopticTemp ProbeValveFiberOpticBLKWHTBLUEOORANGEREdREdWHITE

Página 9 - Battery Cable

• Cab-over Trucks– Be careful when locating the exitpoints of the fiber optic cable fromthe RDU. The entrance point mustbe as close to the pivot point

Página 11

• ACC. hook-up and 12VDC hook-up– First locate the ACC. position on the fuse box by using a trouble light or a volt meter.– With the truck turned OFF,

Página 12

IndexMajor Components Page 3Equipment needed Page 4General Instruction Page 5Pre Installation Electrical Page 6, 7 & 8Mounting , Cable and Routing

Página 14 - • Flow Meter Connection

Valve & Solenoid MountingValve PowerEmergency StopValve FiberOptic

Página 16

LPG Valve Wiring DiagramValve Fiber OpticCable from RDUFiber OpticConnectorPower CableSolenoid ValveSolenoid Terminal BlockConnectorS1- for single sta

Página 17 - Tilt Cabs

Fuel Oil Valve Wiring DiagramValve Fiber OpticCable from RDUFiber OpticConnectorPower CableSolenoid ValveSolenoid Terminal BlockConnectorNote: The wir

Página 18 - Conventional Cab

Valve Wiring for LPGGNDPower InputLPG - Solenoid hook-up 12VDC & S1(12 volts)S1S2When the Solenoid is de-energized you will see 12 volts on both R

Página 19 - CAB HOOK-UP

Valve Wiring for Fuel Oil12 Volt Power InputFiber OpticGNDNote:S1 is setup singlestage or LPGS2 is setup for dualstage solenoids orNote: Whenhooking u

Página 21 - Valve & Solenoid Mounting

Emergency Shut-Off Switch WiringDiagramPower CableTo Valve Control Box

Página 22 - Valve BOX

LC MeterConnection

Página 23 - LPG Valve Wiring Diagram

• F-RAMS®Major Components– RDU (Rear Display Unit)– MCU ( Master Control Unit)– 2100 Handheld– Epson PrinterF-RAMS®Major Components2100RDUEpsonPrinter

Página 25 - Valve Wiring for LPG

• Handheld Computer Vehicle Cradle– Bench Seat Mount– Split Seat Mount• Vehicle Cradle Connection– Connect the white wire to the 12 volts ( Hot ) and

Página 26 - Valve Wiring for Fuel Oil

• Epson Printer Buttons– When powering up system for the first time,ensure that device prints correctly.– Ensure that all switches on the bottom ofthe

Página 28 - To Valve Control Box

F-Rams®Suite 3104749 Williams Dr.Georgetown, TX 78628Phone (512) 868-8101Fax (512) 868-9115E-Mail: [email protected]

Página 29 - Connection

• Equipment Needed :– 1/2” and 1 1/4” hole punch and rubber grommets.– Power drill with bits. CAUTION! Do not use electric drill around LPG.– Assorted

Página 30 - Meter 2 inch

• General Instructions:– Unpack - Immediately upon receipt– Carefully unpack F-RAMS® & 2100 - Always handle with care. Do NotDrop.– Remove and ins

Página 31 - VEHICLE CRADLE

• Pre-Installation Electrical Checklist:– Operating Specifications:• Idle State (not delivering product) ……. 1 Amp• Delivery Solenoids ……. 1 AmpF-RAMS

Página 32 - EPSON PRINTER

• Pre-Installation Electrical Checklist (cont.):– For proper operation of the F-RAMS®system, the truck electrical system must meetthe following requir

Página 33

• To check the voltage requirements:– With the truck turned off - Use a Digital voltmeter and measure across the battery to determine thebattery volta

Página 34

• MCU Mounting Bracket -Location– The MCU can bemounted either on theback wall of the cab orunderneath the passengerseat. The recommendedlocation is o

Comentários a estes Manuais

Sem comentários