F-RAMS®Installation ManualRev 2.0
Mounting Bracket
• Wiring Cables– To make the installation easier, each F-RAMS®is shipped with 3 quick connectwiring cables. This kit is made up of several cables.– (1
GNDACCTerminal Block on the 1 piece BracketPowerMCUValve
• Routing the cable– Make sure that the fiber optic cables that exit the cab have protection over theirconnectors to keep them clean.– Punch a 1/2” ho
• Flow Meter Connection– Route the fiber optic cable from the back of the MCU unit to the RDU unit which islocated on top of the flow meter.– Avoid su
• RDU Rear Connection– Remove (6) Seal screws holding the backpanel of the RDU. This will expose theinside of the RDU with the followingconnectors:• M
RDU Rear ConnectionPowerMCUfiberopticTemp ProbeValveFiberOpticBLKWHTBLUEOORANGEREdREdWHITE
• Cab-over Trucks– Be careful when locating the exitpoints of the fiber optic cable fromthe RDU. The entrance point mustbe as close to the pivot point
Conventional Cab
• ACC. hook-up and 12VDC hook-up– First locate the ACC. position on the fuse box by using a trouble light or a volt meter.– With the truck turned OFF,
IndexMajor Components Page 3Equipment needed Page 4General Instruction Page 5Pre Installation Electrical Page 6, 7 & 8Mounting , Cable and Routing
----LPG---
Valve & Solenoid MountingValve PowerEmergency StopValve FiberOptic
Valve BOX
LPG Valve Wiring DiagramValve Fiber OpticCable from RDUFiber OpticConnectorPower CableSolenoid ValveSolenoid Terminal BlockConnectorS1- for single sta
Fuel Oil Valve Wiring DiagramValve Fiber OpticCable from RDUFiber OpticConnectorPower CableSolenoid ValveSolenoid Terminal BlockConnectorNote: The wir
Valve Wiring for LPGGNDPower InputLPG - Solenoid hook-up 12VDC & S1(12 volts)S1S2When the Solenoid is de-energized you will see 12 volts on both R
Valve Wiring for Fuel Oil12 Volt Power InputFiber OpticGNDNote:S1 is setup singlestage or LPGS2 is setup for dualstage solenoids orNote: Whenhooking u
E-Stop Box
Emergency Shut-Off Switch WiringDiagramPower CableTo Valve Control Box
LC MeterConnection
• F-RAMS®Major Components– RDU (Rear Display Unit)– MCU ( Master Control Unit)– 2100 Handheld– Epson PrinterF-RAMS®Major Components2100RDUEpsonPrinter
NeptuneMeter 2 inch
• Handheld Computer Vehicle Cradle– Bench Seat Mount– Split Seat Mount• Vehicle Cradle Connection– Connect the white wire to the 12 volts ( Hot ) and
• Epson Printer Buttons– When powering up system for the first time,ensure that device prints correctly.– Ensure that all switches on the bottom ofthe
F-Rams®
F-Rams®Suite 3104749 Williams Dr.Georgetown, TX 78628Phone (512) 868-8101Fax (512) 868-9115E-Mail: [email protected]
• Equipment Needed :– 1/2” and 1 1/4” hole punch and rubber grommets.– Power drill with bits. CAUTION! Do not use electric drill around LPG.– Assorted
• General Instructions:– Unpack - Immediately upon receipt– Carefully unpack F-RAMS® & 2100 - Always handle with care. Do NotDrop.– Remove and ins
• Pre-Installation Electrical Checklist:– Operating Specifications:• Idle State (not delivering product) ……. 1 Amp• Delivery Solenoids ……. 1 AmpF-RAMS
• Pre-Installation Electrical Checklist (cont.):– For proper operation of the F-RAMS®system, the truck electrical system must meetthe following requir
• To check the voltage requirements:– With the truck turned off - Use a Digital voltmeter and measure across the battery to determine thebattery volta
• MCU Mounting Bracket -Location– The MCU can bemounted either on theback wall of the cab orunderneath the passengerseat. The recommendedlocation is o
Comentários a estes Manuais